SR Structure construction site : construction of the Lift 45

Bridging in sight for Lift45 N°1, who will touch the water in Spring 2025 !
Note that in parallel with this first Lift 45 without gauge constraints, we are developing an IRC-optimized version’ (sail plan/keel).